The Problem

A UK water organisation were calling us regularly due to their drives breaking down.

Our Objective

To effectively reduce the costs associated with drive breakdowns, site downtime through increasing reliability.

The Background

A large UK water company were calling us regularly for breakdown assistance. After our engineers had been a few times and noticed the conditions of the drives, they recommended a preventative maintenance (MS kits) be carried out on the drives. The drives themselves were 7 – 8 years old, of different sizes and power ratings.

Preventative Maintenance at a Glance

As drive service partners to the leading main manufacturers we regularly train with them, therefore all of our preventative maintenance is carried out within the specified manufacturers guidelines which are listed below:

  • 3 Years, Auxiliary Fan replacement
  • 6 Years, Main and Auxiliary Fan replacement
  •  9 Years, DC capacitors, Ribbon cables, interface board and Auxiliary Fan replacements
  • Main and Auxiliary Fan replacement

Cleaning and removal of ingress at each stage

Manufacturers Guidelines

Drives manufacturers recommend preventative maintenance be carried out on all drives and 3, 6, 9 and 12 years old, alongside annual servicing.  As per manufacturers guidelines, due to the age of the drives, the assets onsite were overdue 3 and 6 year maintenance.

Our Solution

Once seeing the reliability issues they were facing, and the time and costs being wasted due to their drive failure we conducted a recommendations report based on our findings and presented this to the water company and outlined the cost effective benefits of maintenance spares. Our engineers attended and installed3 and 6-year maintenance spares throughout the facility.

The Results

As a result of the preventative maintenance, the water company saw a huge reduction in their breakdown as drives were now running to their full potential. After installation and upkeep of the maintenance spares the company saw an 86% reduction in downtime due to breakdowns.

Similar case studies

Water and Waste

From Challenge to Success: How Turnkey VSD Rentals Revolutionised an OEM’s Testing Process Case Study

Transforming Pump and Fan OEM Testing with Temporary VSD Solutions. Discover How One of our Clients Revolutionised Their Testing Process

Read article
Water and Waste

The Impact of Variable Speed Drives on Storm Pumps in the UK Water Industry

How Quantum Controls are working to improve efficiency and reduce environmental impacts. Storm pumps play a critical role

Read article
Water and Waste

Using Cutting Edge Technologies to Save our Framework Customer £500,000

Overcoming the £500,000 Barrier in Drive-to-Motor Cable Replacement at NWL’s Ovingham Site The challenge stemmed from existing outdated Rockwell 3.3kV

Read article
Water and Waste

Recycle Plant Avoid Costly VSD Downtime with Drive Service Partnership

Our OneCall contract customer, RPC-BPI Recycled Products located in Scotland called us when one of their Variable Speed Drives had

Read article