Renewing a HVAC System
A UK hospital wanted to reduce the energy wasted through the ventilation exhausted air. The hospital’s HVAC system was renewed with an advanced building control system with heat recovery function. 62 ABB Variable Speed Drives were installed by Quantum Controls Ltd (2.2 – 37Kw).
Project delivered significant specific energy cost reduction due to the heat energy consumption reducing dramatically.
- Energy Saving: 18,440 kWh/year
- CO2 Reduction: 9.2 tonnes/year
News
Find our latest product updates, industry news and all the latest from Quantum Controls.
Find Out MoreResources
Request one of our free guides or have a look at our technical ‘how to’ videos.
Find Out More